route_summary_05_10 (2026-08-11 real trim12).csv
전체 16행 중 앞 16행
| cluster | 방문수 | 처리대수 | 총이동거리_km | 총이동시간_분 | 총작업시간_분 | 총소요시간_분 |
|---|---|---|---|---|---|---|
| 0 | 5 | 18 | 23.97 | 76.8 | 18.0 | 94.8 |
| 1 | 5 | 18 | 25.25 | 79.2 | 18.0 | 97.2 |
| 2 | 5 | 18 | 28.72 | 91.0 | 18.0 | 109.0 |
| 3 | 6 | 21 | 29.06 | 91.7 | 21.0 | 112.7 |
| 4 | 7 | 23 | 30.32 | 104.7 | 23.0 | 127.7 |
| 5 | 4 | 12 | 30.42 | 83.6 | 12.0 | 95.6 |
| 6 | 7 | 24 | 30.93 | 100.5 | 24.0 | 124.5 |
| 7 | 4 | 14 | 18.85 | 61.9 | 14.0 | 75.9 |
| 8 | 6 | 19 | 23.40 | 81.1 | 19.0 | 100.1 |
| 9 | 2 | 7 | 23.53 | 60.0 | 7.0 | 67.0 |
| 10 | 5 | 18 | 29.68 | 87.5 | 18.0 | 105.5 |
| 12 | 5 | 17 | 15.49 | 61.0 | 17.0 | 78.0 |
| 13 | 7 | 27 | 37.06 | 117.3 | 27.0 | 144.3 |
| 14 | 3 | 9 | 23.01 | 64.3 | 9.0 | 73.3 |
| 15 | 6 | 20 | 36.53 | 105.6 | 20.0 | 125.6 |
| 16 | 9 | 32 | 32.72 | 119.9 | 32.0 | 151.9 |